POWERING THE FUTURE:
Utility Infrastructure Overview
Transmission Service
- 2 x 34.5kV independent sub-transmission lines
- Primary line entrance to site on Route 202/206 at River Road
- Secondary line service point on Far Hills Road at Route 202
- Maximum estimated capacity = 50MW (before line upgrades required)
- 2 x 34.5kV independent sub-transmission lines
- Primary line entrance to site on Route 202/206 at River Road
- Secondary line service point on Far Hills Road at Route 202
- Maximum estimated capacity = 50MW (before line upgrades required)
Substation
- 2 x 2500 kVA transformers serving Building D
- 12 x 1500 kVA transformers serving Buildings A, B, and C
- Total installed transformer capacity = 23000 kVA
- 2 x 2500 kVA transformers serving Building D
- 12 x 1500 kVA transformers serving Buildings A, B, and C
- Total installed transformer capacity = 23000 kVA
Provider
- First Energy
- First Energy
Service
- Access to 16” main along Route 202/206 adjacent to the site
- Access to 16” main along Route 202/206 adjacent to the site
Provider
- PSEG
- PSEG
Service
- 16” main transmission line at 170 psi serves site with >3,000 gallons per minute or 4.3M gallons per day capacity
- Distribution on site is delivered via one conduit with three lines
- 16” main transmission line at 170 psi serves site with >3,000 gallons per minute or 4.3M gallons per day capacity
- Distribution on site is delivered via one conduit with three lines
Meters
- Primary meter is located on site close to the South Garage
- Meter 1 = 2 inch, Meter 2 = 4 inch, Meter 3 = 6 inch
- Primary meter is located on site close to the South Garage
- Meter 1 = 2 inch, Meter 2 = 4 inch, Meter 3 = 6 inch
Provider
- NJ American Water
- NJ American Water
Service
- 116,000 GPD sewer capacity contracted with the Township of Bedminster
- 116,000 GPD sewer capacity contracted with the Township of Bedminster
End of Pipe
- Sewer line connects to Bedminster Township pump station – an upgrade to the pump station is scheduled for Q1 2025
- Capacity is allocated on a “first come-first served” basis
- Sewer line connects to Bedminster Township pump station – an upgrade to the pump station is scheduled for Q1 2025
- Capacity is allocated on a “first come-first served” basis
Provider
- Township of Bedminster
- Township of Bedminster
Service
- Redundant fiber conduits are located adjacent to Route 202/206.
- Route 1 supports 12 x 4” diameter conduits with Bell Atlantic fiber
- 10 Gigabyte fiber backbone serves the site
- Telecommunications hub is located in Building B in Room 2b240
- Redundant fiber conduits are located adjacent to Route 202/206.
- Route 1 supports 12 x 4” diameter conduits with Bell Atlantic fiber
- 10 Gigabyte fiber backbone serves the site
- Telecommunications hub is located in Building B in Room 2b240
Building Connections
- PBX Room 1D106 tie to GNOC Computer Room 3D218 3 x 4” conduits, 600 pair UTP for voice, 36 Strand MM Fiber for UGN, 12 Strand SM Fiber for UGN
- Building C tie to Building D with 6 x 4” conduit, 36 Strand MM Fiber for voice, 900 Pair UTP for voice, 96 Strand MM fiber for UGN, 24 Strand SM Fiber for UGN
- MDF Room 1C164 tie to PBX Room 2C142 with TCG/ALS Fiber, 300 Pair UTP
- PBX Room 1D106 tie to GNOC Computer Room 3D218 3 x 4” conduits, 600 pair UTP for voice, 36 Strand MM Fiber for UGN, 12 Strand SM Fiber for UGN
- Building C tie to Building D with 6 x 4” conduit, 36 Strand MM Fiber for voice, 900 Pair UTP for voice, 96 Strand MM fiber for UGN, 24 Strand SM Fiber for UGN
- MDF Room 1C164 tie to PBX Room 2C142 with TCG/ALS Fiber, 300 Pair UTP
Provider
- Verizon
- Verizon